#22 of 30 · Wafer-scale chipmaker & cloud
Cerebras
A dinner-plate chip drawing 23 kW; six data centres; no environmental report.
In plain words
How scores workCerebras scores 37 out of 100 — laggard. Little or no disclosure, fossil-backed capacity, or active disputes with regulators and communities. Confidence in this score is little data (D).
What helps
- Efficiency · Vendor claim of ≈3× compute per watt versus an eight-GPU DGX; very high tokens per second per system.
What hurts
- Efficiency · Each CS-3 draws up to 23 kW; no independent efficiency measurement.
- Carbon · Sites on Texas, Oklahoma and California grids plus G42's UAE capacity; no renewable procurement disclosed.
- Transparency · No environmental disclosure in press releases, funding announcements or IPO materials.
What nobody knows
- Per-prompt energy disclosed
- Per-prompt water disclosed
- Training emissions in model cards
- Annual environmental report
- Location-based Scope 2 reported
- +3 more
Cerebras' CS-3 packs a wafer-sized chip that draws up to 23 kW, cooled by water at 100 litres a minute, and claims about three times the compute per watt of an eight-GPU DGX. It runs inference for Perplexity, Mistral and others from Santa Clara, Stockton, Dallas, Oklahoma City (300-plus CS-3s) and Montreal, with G42's Condor Galaxy systems in the UAE and United States. It raised $1.1 billion at an $8.1 billion valuation in 2025 ahead of an IPO and publishes no emissions, energy or water data.
Key figures
Per-prompt and fleet metrics. Hover a title for what it means; open “How we got this number” for the working.
ecogpt.co estimate; no company figure.
How we got this number
Cerebras serves 70B-class open models (GPU baseline ≈0.25 Wh) and claims about three times the compute per watt of an eight-GPU DGX; with no independent measurement we credit 1.7×. Uncertainty roughly ±3×.
On-site cooling only, so comparable with Google and OpenAI's figures.
How we got this number
0.15 Wh per prompt × 0.3 L/kWh (estimated WUE for closed-loop water-cooled systems in partner sites). Counting the water evaporated to generate the electricity adds ≈0.27 mL.
Location-based: what the grid actually emitted. Renewable certificates would bring the market-based figure near zero.
How we got this number
0.15 Wh × 390 gCO₂/kWh (US grid, location-based).
Location-based estimate for the AI fleet only; not comparable with a full corporate inventory.
How we got this number
60 MW × 8,760 h × 80% utilisation × 390 gCO₂/kWh (US grid). Compute only — nothing else the company does is counted.
How we got this number
Three sites were live before 2025 and six more were announced for the year, tripling capacity.
How we got this number
Closed-loop water cooling at system level inside partner data centres whose heat rejection is undisclosed; 0.3 L/kWh assumed.
How we got this number
The US grid is about 40% non-fossil; Cerebras discloses no renewable purchases.
Hardware & materials
The chips, power, copper and future e-waste behind the fleet — the part sustainability reports leave out
GPUs, TPUs or custom accelerators the company runs. Analyst figures are in H100-equivalents, company figures in physical chips.
How we got this number
More than 300 CS-3 systems at Oklahoma City alone, six inference sites, and G42's Condor Galaxy supercomputers; one CS-3 does roughly the work of 60 H100s. ±2×.
Megawatts the AI fleet pulls. One megawatt runs roughly 750 US homes.
How we got this number
≈2,000 CS-3 systems at up to 23 kW each plus cooling and networking.
Terawatt-hours per year. One TWh is a year of electricity for about 95,000 US homes.
How we got this number
60 MW × 8,760 h × 80% utilisation. Compute fleet only.
CO₂e emitted making the chips and servers before they answer a single prompt.
How we got this number
120,000 accelerators × 514 kg CO₂e each (chip plus share of the host server). Emitted in manufacturing, before the first prompt is served.
Tonnes of server hardware that will be retired in three to five years.
How we got this number
120,000 accelerators × 17 kg of server hardware each. Tomorrow's e-waste unless reused; generative AI could produce 2.5 Mt of it a year by 2030.
Tonnes of copper in cabling, busbars and transformers.
How we got this number
60 MW × 27 t of copper per MW (cabling, busbars, transformers).
Diesel backup units or gas turbines at the data centres, permitted or observed.
How we got this number
60 MW ÷ 2.6 MW per generator, the average size permitted at US data centres. Permit counts are not published fleet-wide; this is the number a fleet this size normally carries.
Share of retired servers and parts given a second life.
Kilograms of antimony-equivalent, the life-cycle unit for scarce minerals consumed.
Score breakdown
Each pillar is 0–100; weights are fixed across the index
- Sites on Texas, Oklahoma and California grids plus G42's UAE capacity; no renewable procurement disclosed. Cerebras
- No environmental disclosure in press releases, funding announcements or IPO materials. HPCwire
- No targets. HPCwire
- No enforcement actions on record. Cerebras
Models
What this company ships, and what each prompt costs
No model-level entries — this company hosts or supplies others rather than serving its own models.
Where the compute lives
Named sites from company disclosures and press reporting
- Sunnyvale HQCalifornia, USA
- Santa ClaraCalifornia, USA
- DallasTexas, USA
- Oklahoma City (Scale Datacenter)Oklahoma, USA · 300+ CS-3 systems.
- Montreal (Enovum)Quebec, Canada
- Condor Galaxy (G42)Abu Dhabi, UAE